Contents Change History How to use this Manual Safety Notices Symbols Safety Notice to Users Declaration of Conformity Environmental Declaration Technical Specification TOC 1000 Unpacking Fittings Kit Contents Installation Generator Environment Generator Overview General Dimensions Rear Connections Electrical Connection Air Purity...
Users can refer to the contents page to find the relevant information. Please review each of the following sections carefully. Thank you for selecting Peak Scientific to meet your gas generation needs, and should you require any further assistance or support please do not hesitate to contact Peak Scientific or the Peak Partner from which you purchased your generator.
Page 4
Warranties and Liabilities Warranty & Liability Coverage Peak warrants that, subject to the provisions in this statement, purchased Peak generators, whether purchased directly from Peak or indirectly via an approved, certified and trained distributor or partner (referred to hereafter as a “Peak Partner”) will comply in all material respects with any specifications referred to in your customer order confirmation and, subject to installation and operational guidelines being followed as described in applicable product manuals, shall be free from any defects in quality of materials or workmanship for a period of one year from the date of installation, provided this takes...
Page 5
any person, in so far as such can be attributed to negligence or breach of duty of care directly resulting from failure of Peak to comply with the provisions in clauses 1, 2, 3, 4 & 5. Exclusions & Limitations 2.
If the user employs an operating procedure, item of equipment or a method of working which is not specifically recommended by Peak Scientific, the user must ensure that the equipment will not be damaged or become hazardous to persons or property.
• Restriction on the use of certain hazardous substances in electronic equipment (RoHS) Directive 2011/65/EU as amended by EU 2015/863. • FCC 47 CFR Part 15 class A Unintentional radiators; Conducted and Radiated emissions limits. Signed for and on behalf of Peak Scientific by Signed: Name: Fraser Dunn...
Page 8
BS61326-1:2013 Electrical Equipment for Measurement , Control and Laboratory Use – EMC Requirements. • The Restriction of the Use of Certain Hazardous Substances in Electrical and Electronic Equipment Regulations 2012 (SI 2012 / 3032) as amended. Signed for and on behalf of Peak Scientific by Signed: Name: Fraser Dunn...
Page 9
WEEE Compliance Statement The Waste Electrical and Electronic Equipment (WEEE) Regulations SI 2013 No 3113 and or the Waste Electrical and Electronic Equipment (WEEE) Directive 2012/19/EU apply to all electrical and electronic equipment placed on the market in the UK and EU covered by the scope of regulations which can be found in the Government Guidance Notes (PDF) produced by the Department for Business Innovation and skills for the UK and here for Europe.
Technical Specification TOC 1000 Environment Minimum Operating Ambient Temperature 5°C (41°F) Maximum Operating Ambient Temperature 35°C (95°F) Maximum Altitude 2000m Maximum Relative Humidity 70% @ 35°C Minimum Storage Temperature 5°C ( 41°F) Maximum Storage Temperature 35°C (95°F) Maximum Storage Temperature...
Check ‘SHOCKWATCH’ and ‘TIP-N-TELL’ labels for signs of rough handling prior to unpacking. Any damage should be reported immediately to the carrier and Peak Scientific or the Peak Partner from where the unit was purchased. Follow the unpacking instructions posted on the side of the crate. It will require two people to remove the unit from the shipping crate and to manoeuvre the generator to the desired location.
5. Cable C13 Nema 5 15 US 110V 2m 6. Elbow ¼”M BSPPx6mm Push Fit 7. TOC 1000 Installation guide All of the generators output ports are located on the output panel at the rear of the unit. Page 12...
Installation Generator Environment The generator should, if possible, be installed next to the application,. If, however, this is not possible, please consider the distance between the generator and your application, since pressure drops can result from extended lengths of tubing and may affect gas delivery.
Generator Overview General Dimensions 270 mm 530 mm The generator must always be placed on a flat, level surface. Failure to do so will affect the performance of the generator. WARNING Page 14...
Rear Connections Product Gas Outlet Power Inlet Air Inlet Ensure all inlets and outlets are connected to correct sources and applications. WARNING All Connections should only be carried out by trained personnel. Generator must be switched off and unplugged prior to any cleaning or maintenance operations.
Electrical Connection Connect the generator to an appropriate 120 or 230 volt single-phase supply, refer to the generator serial plate for input specification and ensure your supply matches the requirements. If the appropriate power cord is not supplied, a new plug with correct rating can be fitted by a qualified electrician, ensuring that it has adequate ratings and appropriate approvals for the country of operation.
Air Purity The Precision Zero Air Series generator should be connected to an air supply that, as a minimum, meets ISO8753-1:2010 Class 1.4.1 Class 1 Particulate In each cubic metre of compressed air, the particulate count should not exceed 20,000 particles in the 0.1 - 0.5 micron size range, 400 particles in the 0.5 - 1 micron range and 10 particles in the 1 - 5 micron size range.
Start-Up Sequence Before the generator is first connected to the application, the generator should be operated in isolation (i.e. not connected to the application) for 120 minutes. This is to ensure that any impurities are purged from the system. Failure to do this may harm the application. CAUTION Page 18...
> 10 - 40 meters: Use 10mm OD / 8mm ID or 3/8” OD / 5/16” ID tubing. > 40 metres: Please contact Peak Scientific with the relevant distance and we will calculate the flow resistance and the tubing size required.
Peak Protected With Peak Scientific you invest in not only a product but peace of mind. With a network of certified Peak engineers stationed throughout the globe, Peak’s rapid response team are never far away and our commitment is to keep your generator running day in, day out, protecting your laboratory workflow.
Cleaning Clean the outside of the generator only using warm soapy water and a clean damp cloth. Ensure all excess fluid is thoroughly removed from the cloth prior to use. Cleaning should only be undertaken with the power switched off and the power cord removed from the rear of the generator.
Troubleshooting Problem Possible Solution • Check for leaks between the TOC 1000 and the application. The application is reporting low pressure. • Contact your service provider. Page 23...
Page 24
See our enclosed Peak [Protected] leaflet for further information. Important! You have 1 month to register your Peak Scientific product from the date of installation. Once registered the warranty will be honoured for a period of 12 months. If you wish to defer the installation of your generator, you must notify Peak Scientific immediately by emailing warranty@peakscientific.com.
Need help?
Do you have a question about the TOC 1000 and is the answer not in the manual?
Questions and answers