Vanair AIR N ARC RELIANT 300 Series Operations Manual & Parts List page 65

All-in-one power systems hydraulic
Hide thumbs Also See for AIR N ARC RELIANT 300 Series:
Table of Contents

Advertisement

®
AIR N ARC
300 SERIES ALL-IN-ONE POWER SYSTEM
4.7 . Use the following check list to aid in determining that
all functions are ready for a test run.
PRE-TEST FUNCTION CHECK LIST
TASK
Preparing the Vehicle Service Body
Mounting the Machine
Grounding the Machine
Installing the Remote Air Tank
(Skid-Mount Model)
1. With the vehicle located on a level surface
check all fluid levels ( NOTE: vehicle should
be on a level surface in order to get accurate
fluid level checks). If fluid refills are needed
refer to Section 6.5.2 for compressor oil
maintenance.
2. If machine is not in its mounting position,
move the unit into its final location, while
positioning the control trunk line and all other
connections.
3. Bolt the machine down with four ½" bolts or
vibration isolators inserted up from the
bottom through the four mounting bolt holes
of the base frame (refer to Section 4.5.3 and
Figure 4-6 ). See Section 4.10 , Parts 1 and
2 , for base mounting pattern, etc.
Note that, with the addition of the vehicle
mounting surface and the isolator thickness, the
bolt must have a minimum clearnance of 2-1/2"
threads above the fastening nut after final
tightening (see Figure 4-3 ). Should the mounting
bolts from the shipping crate prove to be too
short, replace them with proper length bolts.
4.
Start the unit and fully test all functions (refer
to Section 5, Operation ). Warm the unit to
full operating temperature. After the unit has
cooled, check all fluid levels and add as
needed.
®
SECTION
COMPLETED
REFERENCE
4.4
4.5
4.6
4.9
090034-OP_r0
SECTION 4: INSTALLATION
PAGE - 47

Advertisement

Table of Contents
loading

Table of Contents