Download Print this page

Electrical Specifications; Mechanical Specifications; Startup Procedure - Cecilware JAVA GIANT 2 Operational Manual

Coffee dispensers

Advertisement

MODEL NO:
JAVA GIANT 2 (USA & CANADA)
JAVA GIANT 2 (USA & CANADA)
UNITS OVER 30 AMPS MUST BE HARDWIRED. CORDS NOT SUPPLIED. FOR ALTERNATIVE WIRING METHODS, SEE HEATER POWER WIRING DIAGRAM.
MODEL NO:
JAVA GIANT 2 (USA & CANADA)
JAVA GIANT 3 (USA & CANADA)
Height: add 4" for legs;
Depth: add 2" for clearance for waterline hookup;
FAST START UP PROCEDURE
Water Inlet Connection
This equipment is to be installed to comply with the applicable Federal, State, or local plumbing codes having jurisdiction. In addition:
1. A quick disconnect water connection or enough extra coiled tubing (at least 2x the depth of the unit) so that the machine can be moved for
cleaning underneath.
2. An approved back flow prevention device, such as a double check valve to be installed between the machine and the water supply.
The JAVA GIANT 2/3 (USA and CANADA) is equipped with a 3/8" Flare Water Inlet Fitting.
HIGHLY RECOMMENDED:
A WATER SHUT-OFF VALVE and A WATER FILTER, preferably a combination Charcoal/Phosphate Filter, to remove odors and inhibit lime and scale
build up in the machine. Note: In areas with extremely hard water, a water softener must be installed in order to prevent a malfunctioning of the
equipment and in order not to void the warranty.

STARTUP PROCEDURE

Caution: Make sure that the Heater Switch, located behind right hopper with door opened, is in the OFF position.
1. JAVA GIANT2/3 (USA & CANADA) - Connect the 3/8" dia copper waterline to the 3/8" flare water inlet fitting of the valve.
2. Plug the power cord into a proper receptacle.
3. Activate the Power Switch (Toggle Up). The door display panel and the green dispense buttons will light up and the tank will start filling.
Allow approximately 4-6 minutes for the tank to fill.
4. Activate the Heater Switch. Allow approximately 20-30 minutes for the water to reach a preset temperature of 195°F.
The heat up time will depend on the water inlet temperature, the input voltage and the wattage of the elements in the machine.
5. Place decanter under nozzle and press dispense switch. The machine will dispense water at the rate of 4 oz. per second.
Repeat it several times for each dispense switch to check for consistent output.
6. While the tank is heating up, remove the hoppers, load them with products and reposition them back in the machine.
When the heater light goes OFF, the tank has reached its brew temperature and the machine is ready to dispense Coffee.

ELECTRICAL SPECIFICATIONS

PHASE:
VOLTS:
TOTAL
KW
1 PHASE
120
1.7
230
6
1 PHASE
1 PHASE
230
9
1 PHASE
230
18
3 PHASE
230
18

MECHANICAL SPECIFICATIONS

WIDTH
DEPTH
HIGHT
IN
IN
IN
14.125
24.25
40.5
20.375
24.25
40.25
NO. OF
AMPS
HZ.
HEATERS
1
15
60
3
26
60
3
39
60
3
78
60
3
45
60
HOPPERS
TANK
QTY LB. COFFEE
GAL.
2
5.25
7.5
3
5.25
10.5
RECEPTACLE
CIRCUIT
NEMA
BREAKER
L-5-15
15A
L6-30R
30A
HARDWIRED
50A
HARDWIRED
100A
HARDWIRED
60A
ART AREA
SHIPPING
IN
WEIGHT LB.
13.75 x 16.75
155
20 x 16.75
195

Advertisement

loading

This manual is also suitable for:

Java giant 3Java self serveJava jr-pc