VOLTAGE MONITORING
EVM-05C
CHANGING USER PASSWORD
Press SET button for 3 secs.
SET
Find Pin menu by
scrolling
UP/DOWN
buttons.
Press SET
SET
button(Pin Act is
displayed)
Find Pin Chg menu by
scrolling UP/DOWN
buttons.
Enter old password by
scrolling UP/DOWN and
SET
SET buttons.
Enter new password by scrolling UP/DOWN and
SET buttons.
SET
Enter new password again by scrolling UP/DOWN
SET
and SET buttons.
Press SET button(Pýn Chg is displayed)
SET
Press ESC button one by one until SAU SEt yES is
ESC
displayed.
Press SET button while SAU SEt yES is displayed.
SET
The menu that the user password is activated.
After user password is activated,it will be asked when
entered menus.
If the user password is entered wrong, the device will not
be locked.
According to the factory settings, the password is set to
1234.
TECHNICAL SPECIFICATIONS
Rated Voltage (Un)
Operating Frequency
Auxiliary Supply Power Consumption
Measuring Input Power Consumptio
Voltage Inputs
Measurement Range
Class
Voltage Transformer Ratio
Output Contact
Ambient Temperature
Display
Dimensions
Equipment Protection Class
Box Protection Class
Terminal Protection Class
Box Material
Installation
Wire Cross section (for terminals)
Weight
Installation Category
Panel Size
Factory Settings :
Utr
- 0001
Hi L-1 - 260
Pin
- 1234
Hi L-2 - 260
Con
- StAr
Hi L-3 - 260
PHS Seq - oF
Hi HyS - 005
Lat CH
- oF
Hi ond - 001,0
Ins trP
- oF
Hi oFd - 001,0
kV
kV
kV
V
V
H
L
H
L
H
L
L-L
L-N
Hz
EVM-05C
VOLTAGE
MONITORING
H
L
True RMS
L1
L2
L3
V
L-L
V
L-N
VOLTAGE
H
kV
MONITORING
L
EVM-05C
True RMS
H
kV
L
H
kV
L
Hz
H
L
OUTPUT 1
OUTPUT 2
:110 VAC,220 VAC,380VAC
: 45-65 Hz
: < 4 VA
: < 1 VA
:10-300 VAC ( L-N)
10-500 VAC (L-L)
: 0...400kV
: 1±1 digit [(%10-%100) x full scale]
: 1...4000
: 2 NO, 5A 1250 VA
: -5 ºC; +50 ºC
: Red LED Display
: PR-19 PR-16 PK-26
: Double Isolation Class II
: IP 40
: IP 00
: Nonflamable
: Panel Mounted (PR-16, PR-19)
Rail Mounted (PK-26)
: 2.5 mm²
: 0.45 kg (PR-19, PK-26)
0.8 kg (PR-16)
: Class III
: 139x139 mm (PR-16)
91x91 mm
(PR-19)
46x107 mm (PK-26)
Lo L-1 - 190
Frq Hi
- 52,0
Lo L-2 - 190
Frq Lo
- 48,0
Lo L-3 - 190
Frq HyS - 01,0
Lo HyS - 005
Frq ond - 001,0
Lo ond - 001,0
Frq oFd - 001,0
Lo oFd - 001,0
ACTIVATING USER PASSWORD
Press SET button for 3 secs.
SET
L2
L3
L1
Find Pin menu by scrolling UP/DOWN buttons.
SET
Press SET button(Pin Act is displayed)
ESC
SET
Press SET button
SET
Enter 1st digit value by scrolling UP/DOWN buttons
you set 1st digit value incorrect, you can set again by
pressing ESC button.)
SET
Press SET button
SET
ESC
Enter 2nd digit value by scrolling UP/DOWN buttons
you set 2nd digit value incorrect, you can set again by
pressing ESC button.)
SET
Enter 3rd digit value by scrolling UP/DOWN buttons
you set 3rd digit value incorrect, you can set again by
pressing ESC button.)
SET
Enter 4th digit value by scrolling UP/DOWN buttons
you set 4th digit value incorrect, you can set again by
pressing ESC button.)
SET
Press SET button after you enter the value(Pin ACt oF
is displayed)
ESC
SET
The area Measurements
on The Control Panel
91mm
Type PR 19 (96x96)
Dimensions
96mm
Type PR 19 (96x96)
30.1
7.6
10.8
26.5
21.5
53.0
58.0
8
Press SET button
kV
V
V
H
L
H
L-L
L-N
Press SET button
Hz
H
L
Press ESC button one by one until SAU SEt yES is
displayed.
Press SET button while
SAU SEt yES is displayed.
Wall
79.3mm
70mm
Tip 19
139mm
50mm
79.3mm
70mm
9.5
60.6
106.0
10.0
Type PK-26
(If
(If
(If
L2
L3
L1
kV
kV
L
H
L
SET
EVM-05C
ESC
VOLTAGE
MONITORING
True RMS
(If
L1
L2
L3
V
L-L
V
L-N
VOLTAGE
H
MONITORING
kV
L
EVM-05C
True RMS
H
kV
L
H
kV
L
SET
Hz
H
L
ESC
OUTPUT 1
OUTPUT 2
18
Wall
34.5
58mm
50mm
Type PR 16
18
121
34.5
138.4
143
58mm
Type PR 16
A2889/Rev.2
Need help?
Do you have a question about the EVM-05C and is the answer not in the manual?