VAM 10.1 / VAM 40.1
5.2
Installation
Installation Notes
Mounting Cut-Out
DOK-SUPPL*-VAM*10/40**-PR02-EN-P
• When installing the operator panel , observe to ensure an ergonomic
operation. Additionally, ensure that all moving machine components
are in sight of the operator.
• Avoid installation locations exposed to direct sunlight, as additional
heat development can occur.
• Install the operator panel in a manner ensuring easy access to the
front panel (top side).
• Observe that the LED displays on the front panel are not obstructed.
• Provide a sufficient minimum clearance of 50 mm for cooling and
cable routing behind the device.
• Lay all connecting cables in loops and use strain reliefs for all cables.
• Keep a suitably large distance from sources of interference.
For mounting the operator panel proceed as follows:
1. Create a mounting cut-out with 6 holes, diameter 4.5 mm, according
to the illustrations "Mounting dimensions" on the following page.
2. Insert the operator panel from the front into the cut-out. Then insert
the mounting bolts M4 into the drilled holes.
3. Fasten the operator panel by screwing the nuts at the rear side of the
mounting bolts.
5-3
Dimensions