Wall Hanging Installation - Planet WGs-4215-8HP2S Quick Installation Manual

Gigabit ethernet switch
Table of Contents

Advertisement

3.2 Wall Hanging Installation

To hang the Wall-mount Managed Switch on the wall, simply follow the following
steps:
Step 1: Drill 2 holes (one hole on each side) with 8mm diameter on the wall; the
distance between the 2 holes is 230 mm and the line through them must
be horizontal.
1
Step 2: Place two anchors inside the hole by hammering them. Then screw the
two screws leaving a space of 2mm apart as shown in the circled diagram
below.
Du al po
we r inp ut
for ma xim
is req uir
ed
um Po E
loa din g.
1
V1
Gr ou nd
PW R 1
V1 +
V2
PW R 2
V+
V2 +
DC Inp ut
Ra ng e
DC Inp ut
48 -54 V
Ra ng e
48 -54 V
, 8A ma
x.
, 8A ma
x.
Sm ar t LC
Po E++
PW R
Fi be r
Fi be r
W GS -42
100 0
1
W GS -52
LN K/A CT
36 0W
15 -8H P2
25 -8U P2
10/ 100
2
LN K/A CT
3
bt Po E-i
24 0W
n-U se
4
Po E Us
at Po E-i
ag e
n-U se
12 0W
100 0
LN K
AC T
100
9
LN K
AC T
SF P
10
5
SF P
9
10
6
2
3
4
100 0
LN K/A CT
10/ 100
LN K/A CT
bt Po E-i
Ma x. Fa
n-U se
at Po E-i
ult Ala rm
n-U se
Lo ad ing
: 24 V, 1A
Po E+ +
D
PW R 1
PW R 2
Rin g
M an ag ed
M an ag ed
R.O .
1G /2.5 G
S
SV
LN K
AC T
100
9
LN K
AC T
SF P
5
10
6
7
8
6
7
8
Po E+ +
100 0
LN K/A CT
10/ 100
LN K/A CT
at Po E-i
n-U se
Po E+
SF P
9
10
2
4mm Screw
2mm

Advertisement

Table of Contents
loading

Table of Contents