Siemens ST950 Plus+ User Manual page 72

Hide thumbs Also See for ST950 Plus+:
Table of Contents

Advertisement

ST950 Plus+ User Manual
48V Supply
48V Supply
Figure 36 PTB with 4 Way street cable and Dropper Cable for the first Node
The power pair (Red and Blue) will be connected to the first supply column (PL15), which is also
numbered 1.
The data pair to the node (Yellow and Black) are connected to PL1 (labelled "To ByPass"). The data
pair from the node (Orange and White) are connected PL2 (labelled "From ByPass").
In order to complete the circuit onwards to a downstream Node, a link pair (yellow and black) is
required from PL3 to PL12.
If a second node requires connection, then the next set of connectors are used (all labelled '2')
and the link pair will then be moved to link PL5 to PL12.
Terminal blocks mounted on the opposite side of the PTB bracket are available for Spur
connections. Spur connections from PTB to Node use Red, Blue, Yellow and Black wires in the
Plus+ dropper cable (Orange and White wires are unused for Spur connections). Spur wiring from
the terminal block to the remote Node uses armoured street wiring.
ST950 Plus+ User Manual
Page 72 of 176
667/HE/53000/000
Node
Node
Connection
Connection
Positions
Positions
Issue 2
Unrestricted

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents