6.9.12 Lamp Testing
The ability to test individual lamps is an important facility that allows faults to be identified easily
and rectified.
At first commissioning or whenever major changes are made to the site signalling equipment a
full lamps test must be performed to verify that all lamps are operating correctly.
The inbuilt self-test facility can be used to illuminate each aspect in turn or the lamp test facility
that allows individual aspects to be illuminated is provided via the web page:
Status and Configuration → Controller → Phases → Lamp Test
To use this facility level 3 access is required and the signals on/off switch MUST be in the OFF
position.
Use with Care
All aspects under test must be covered.
The aspect to be tested is identified and the following information entered into the web page:
Phase
Aspect Colour
Duration of Test in seconds
Once this information has been entered, press the 'Submit' and 'Confirm' buttons
to start the test. The remaining time for the test is displayed against 'Progress'.
The RS232 Handset 'LMP' command can also be used for lamp testing.
6.9.13 Solar Cell Testing
Solar Cell Testing
For this test to be performed the ambient light conditions must be appropriate to set the bright
condition on the controller.
Correct operation of the solar cell can be checked by covering the solar cell for at least one minute
and checking that the controller (suitably configured to allow dimming) dims the signals. Remove
the cover and check that the signals return to the bright condition.