Takeuchi TB215R Workshop Manual page 128

Hide thumbs Also See for TB215R:
Table of Contents

Advertisement

1 2nd auxiliary line piping
2 Do not overtighten the castle nut.
After tightening down the castle nut by hand, firmly tighten it down further until the tightening hole positions line up
properly and then secure the castle nut in place with a cotter pin.
3 After applying NEVER-SEEZ NS (Regular grade) or an equivalent anti-seizing lubricant, put the parts together.
• During assembly, grease the pins using lithium grease EP-2 supplied from the grease nipples.
1. Arm
2. Link arm
3. Guide link R
4. Guide link L
5. Pin
6. Pin
7. Pin
8. Pin
8-1. Pin
ATTACHMENTS
9. Bucket cylinder
10. Stop valve
11. Adapter
12. Shim (Selected usage)
13. Shim (Selected usage)
14. Boom
15. Wire harness
16. Working lamp
17. Boom cylinder
2
DISASSEMBLY AND ASSEMBLY
ATTACHMENTS
18. Pin
19. Pin
20. Pin
21. Pin
22. Pin
23. Shim (Selected usage)
24. Shim (Selected usage)
25. Shim (Selected usage)
26. Arm cylinder
4
4G0AX001

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

215000003Tb216Wetb280fr

Table of Contents