Maintenance And Inspection Schedule - Bosch REXROTH mMS 4.0 Operating Manual

Table of Contents

Advertisement

62/68
Bosch Rexroth AG
Maintenance and inspection

12.2 Maintenance and inspection schedule

In the following table, the work is organized by maintenance interval and then by
assembly / part. The intervals are must be kept to.
Table 11: Maintenance and inspection work on the training system
When?
What?
daily/
Overall training system
prior to
each use
When?
What?
Weekly
Overall training system
Connection elements
Training system mMS 4.0 | R901429162/04.16
Where?
Comments
Clean environment
Remove parts lying
of the training
around
system
Clean and keep
the working
surfaces free.
Where?
Comments
Inspect electrical
Have damage
connection cables
rectified by the
and lines for visible
responsible
damage (friction
qualified electrician
marks, cracks, cuts).
right away
Inspect electrical
Have damage
devices, control
rectified by the
boxes and switches /
responsible
buttons for visible
qualified electrician
damage (cracks)
right away
Inspect the visual
Secure loose
inspection for
screws etc again.
damage and
Have damage
firm fitting
rectified right away.
Notify Bosch
Rexroth After-sales
service.

Advertisement

Table of Contents
loading

Table of Contents