3.2.2
Mounting the Power Box Assembly (For Concrete walls)
1.
Drill the marked points using the hammer drill.
2.
Remove the debris and clean the holes using the dust pump.
3.
Anchor the bolts (Part No.19) with the hammer.
Hammer
Anchor bolt
4.
Remove the front cover of the Power Box Assembly.
EzRay Air W (Model: VEX-S300W) Installation Manual
Part No.: 19
Size: M8 x 30
Qty.: 6 ea
ex) Cabinet Installation Type
3. Installing the Equipment
23