4. INSTALLATION PROCEDURE

Thank you for installing this charge point. Make sure
there is enough space to properly do the work.
Ensure to work safely and take the safety of others into
consideration as well, always work according to local
safety regulations. Ask the owner if there is anything
of significant importance that requires electricity in the
house, before you turn of the electricity.
When selecting the mounting location of the charge point,
ensure that future maintenance work can be carried out
safely without obstruction.
4.1 PREPARATION
Step 1: Prepare the cabling & RCD and MCB (conform to
local rules & regulations);
Step 2: Indicate which circuit(s) the charge point is
connected to in the distribution board;
Step 3: Turn the socket lid anti-clockwise and out of the
cover of the charge point;
Step 4: Then pull the cover from the rear edge to open
the charge point. Do not use any objects or tools to do
this.

4.2 MECHANICAL MOUNT

Step 1: Put the charge point back plate on the wall
to check its placement (charge point is leveled and
connector at +/- 1 m height). On the wall, mark the
positioning of the top two and bottom two attachment
points of the charge point and select the appropriate
fixtures (plugs, screws and washers).
Step 2: Drill all four holes and put the plugs in place.
Step 3: Place the two provided plastic spacers at the
backside of the bottom two attachment points. Secure
the charge point to the wall using the top two and
bottom two attachment points. Ensure that the rubber
and stainless steel washers are used and placed on the
back of the charge point at the bottom two attachment
points.
4.3 POWER CONNECTION
Step 1: Select the appropriate grommet that suits the
cable thickness and place it in the opening of the power
cable inlet. Lubcirate if necessary to make it easier to
feed the power cable through;
Step 2: Secure the power cable using the cable clamp;
Step 3: Connect the power to the terminal blocks, as
indicated in '2.4.1 Overview of Connections'
INSTALLATIEHANDLEIDING – P24
INSTALLATION MANUAL – P24 | P24
4.4A DYNAMIC POWER MANAGEMENT
The Current Transformer for Dynamic Power
Management (included in box) must be connected to the
phase used by the charge point at the most upstream
point of the house grid, closest to the house grid
connection.
Step 1: Install the CT on the same phase used by the
charge point, measuring the whole household. Place the
terminal block on a DIN-rail in the fusebox;
Step 2: Place a standard cable of 2x 1,5mm
supplied) and connect two wires on both terminal blocks
in the charge point as indicated in the '2.4.2 Overview
Installing Accessories' section. Then place the cable of
2x 1,5mm
to the CT on the side of the grid connection.
2
The maximum length of the cable is 100m.
4.5 CHARGE POINT CONFIGURATION
Charge point configuration should be done before the
charge point is powered on. To configure charge point
features such as Dynamic Power Management, please
follow the instructions as described in chapter 5 of this
installation manual.
4.6 FINISHING UP (CLOSE
ENCLOSURE)
Step 1: Check and make sure that the rubber seal
around the casing is properly in place on the edge;
Step 2: Place the cover on the charge point;
Step 3: Hand-tighten the four M4 x 12 mm bolts
provided around the socket so that the cover closes on
the rubber seal but the rubber seal does not deform;
Step 4: Hand-tighten the other two M4 x 12 mm bolts
provided in the bottom of the cover;
Step 5: Turn the socket lid clockwise in the cover and
hand-tighten the M4 x 20 mm bolt provided;
Step 6: Switch on power to the charge point;
Step 7: Wait until charge point is fully started up (+/-10
minutes, LED should be off).
VERSION 0129NM02INT01
06ANM20INT01
(not
2