Installing The Control Panel - Alpha-InnoTec SWC H1 Series Operating Manual

Brine/water heat pumps
Table of Contents

Advertisement

6.5 Installing the control panel

NOTE
The control can be inserted in a recess in the
front panel of the unit or can be installed on
the wall.
Insert the control in the unit and connect
1.
housing panels for transport with handcart or
together and push out of the openings.
2.
panel.
3.
Position the control in the recess in the front unit
panel.
4.
Cut the cable to length generously so that the
front panel can be removed and placed to the side
of the unit. Do not cut the cable ties for strain relief
of the LIN bus cable at the electric control box.
the strain relief at the electrical control box
All other cables approx. 1.2 m
Subject to change without notice | 83057200dUK – Translation of the original operating manual | ait-deutschland GmbH
5.
"Dismantle
6.
Push the cable through the opening in the front
panel of the unit from below and into the control.
7.
Press the lugs of the control into the openings in
the front panel of the unit.
Mount the control on the wall and connect
ATTENTION
tically on a wall!
1.
2.
3.
4.
the web at the bottom in the middle of the wall
5.
6.
or from below.
200 mm
only ver-
Dimensional drawing "Wall-
15

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SWC H1 Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

This manual is also suitable for:

Swc 82h1Swc 102h1

Table of Contents