10 Commissioning
Relevant planning & design data of the system is
documented in full.
of operation of the heat pump system.
System is air-free.
been completed successfully.
1.
completely:
the compressor
The system is installed and mounted in accord-
ance with this operating manual
The electrical installation has been carried out
properly in accordance with this operating manual
and local regulations
The power supply for the heat pump is equipped
The level of the tripping current is compliant
Frost protection of the heat source meets the re-
quirements
"Technical data / Scope of supply", from
page 21
The pipe systems and components of the system
2.
Fill out carefully and sign the notice of completion
for heat pump systems.
3.
In Germany: Send notice of completion for
the manufacturer's factory customer service
department.
In other countries: Send notice of completion for
manufacturer's local partner.
4.
Arrange for the heat pump system to be
commissioned by after-sales service authorised
by the manufacturer; this is a chargeable service.
Subject to change without notice | 83057200dUK – Translation of the original operating manual | ait-deutschland GmbH
11 Maintenance
NOTE
We recommend that you sign a maintenance
agreement
with
company.
11.1 Basic principles
The cooling circuit of the heat pump requires no
regular maintenance.
tests performed or not, and at what time intervals.
Ensure compliance with local regulations with
11.2 Maintenance as required
heating circuit and the heat source, e.g. valves,
traps
Test the function of the safety valve for the heat-
ing circuit
11.3
and condenser
according to the manufacturer's regulations.
chemical
cleaning
thoroughly with water.
11.4 Yearly maintenance
Record the quality of the heating water analytically.
suitable measures without delay.
an
accredited
heating
product:
neutralise
any