Connecting The Fault Report Contact; Power Supply Connection And Commissioning - Viessmann CS Installation And Operating Instructions Manual

Refrigeration units with sd control unit
Table of Contents

Advertisement

7.2

Connecting the Fault report contact

The electronic SD Control unit is outfitted with a potential-
free Fault report contact for connection to the on-site Fault
reporting equipment (max. 10A, 230VAC).
In the event of a fault, contacts C and NC are closed.
The connection is located on the circuit board (plug connec-
tor A3 orange).
7.3

Power supply connection and commissioning

Attention!
The electrical power supply should first be connected at
commissioning - Risk of life!
Work on the power supply connector and protection
devices must be carried out by a specialist company, in
accordance with IEC 364, local regulations and the connec-
tion conditions of the respective energy supply company!
Insert the mains plug into the approved and properly
grounded socket (230 VAC or 400 VAC, 50 Hz, 16A slow-
blow).
Electronic SD Control unit
The unit starts after the Control unit self-test function and
afterrun-out of an approx. 3 minute delay time (adjustable
via parameter P34). During the initial switch-on, this time
delay can be bypassed by switching the unit off, then by
switching it subsequently back on by means of the Start/
Stop key. The "Stop-Start-Enter" key must be actuated for
approx. 3 sec. in order to switch off the unit.
General notice (liability): the details of this technical documents serve for description. Consents regarding the availability of certain features or
regarding a certain purpose always require a special written agreement.
Page No. 17-GB
A3
7.2 - 7.3
C NC NO
We reserve the right to make technical changes!
GB

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents