Layout And Installation Of The Pipelines; Layout And Installation Of The Electrical Lines - Viessmann CS Installation And Operating Instructions Manual

Refrigeration units with sd control unit
Table of Contents

Advertisement

GB
5.3

Layout and installation of the pipelines

Solder the solder connections (P and Q) on the Refrigeration
unit to the solder connections on the evaporator unit by
means of a suitable copper pipeline.
Check all solder points for leak-tightness!
The length of the pipeline must not exceed15 m!
Unit
Fluid line (P)
Suction line (Q)
Unit
Fluid line (P)
Suction line (Q)
5.4

Layout and installation of the electrical lines

For practical purposes, the Layout and installation of the
electrical lines takes place along the pipeline.
Insert the electrical connector plug into the appropriate
plug adapter on the Refrigeration unit circuit board.
Attention!
The electrical power supply should first be connected
at commissioning - Risk of life!
General notice (liability): the details of this technical documents serve for description. Consents regarding the availability of certain features or
regarding a certain purpose always require a special written agreement.
Page No. 14-GB
Pipe diameter in mm
CS 900
CS 1300
CS 2000
6
6
6
10
12
12
Pipe diameter in mm
FS 900 FS 1200 FS 1400 FS 1800 FS 2400
6
6
10
12
12
16
CS 2800
10
16
10
10
16
16
5.3 - 5.4
We reserve the right to make technical changes!

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents