ENSURE THAT TRACK OUT-OF-SERVICE INPUT IS RETURNED TO DE-
ENERGIZED WHEN THE TRACK IS PUT BACK IN SERVICE.
The island cannot be taken out of service by itself, the GCP has to be first
taken out of service.
If OOS Control is set to OOS IPs the options to take the GCP out of service will not be enabled on the
Out of Service screen.
To take the island out of service, first take the GCP out of service, then select the Take ISL Out of
Service button shown in Figure 2-13 above.
This will bring up the following confirmation screen.
If required, select OK to continue.
The Out of Service screen will now show the Island as Out of Service, and the top system level screen
will show the message GCP-ISL OOS that will alternate between blue and white. The track module will
display the messages GOFS and IOFS on its four-character display. As before, the maintenance call
output on the GCP will turn off, this will cause the maintenance call lamp to go off, if it is wired.
SIG-QG-20-02
Version : A.2

Figure 2-14 Island Out of Service Confirmation

Figure 2-15 Island Out of Service Indications on WebUI