Rigid Wall Installation Mf2 Installation Frame - Swegon Actionair ThermShield MF Installation Manual

Table of Contents

Advertisement

ThermShield MF(1 & 2) Installation Guide
1
2
Rigid wall installation
MF2 installation frame
Damper blade must be closed during installation!
The wall is composed of concrete blocks (minimum
density of 550 kg/m³) or reinforced concrete (minimum
density of 2200 kg/m³) and with a minimum thickness of
100 mm.
1. Prepare opening in the wall according to B (H)
+ 80 mm.
Damper blade must be closed during installation!
2. Insert fire damper into wall and fasten with screws (12
pcs, 6x160 mm)
Ensure that the damper is sufficiently supported.
Test the operation of the damper blade!
5
20210615 - L00014 Swegon reserves the right to alter specifications.