Suzuki RM 250 2003 Owner's Service Manual page 41

Table of Contents

Advertisement

3-6
ENGINE DISMOUNTING AND MOUNTING
Install the parts in the reverse order of removal. Pay attention to
the following points:
• Tighten the brake pedal pivot bolt 1.
# Brake pedal pivot bolt: 29 N·m (2.9 kgf-m, 21.0 lb-ft)
Replace the cotter pins with new ones.
• Reassemble the drive chain clip so that the slit end faces
opposit to the direction of rotation.
• Install a new exhaust pipe gasket.
• Apply a small quantity of transmission oil to the O-ring before
installing the exhaust pipe.
• Fit the projection of the carburetor to the depression of the
intake pipe.
INSPECTION AFTER ENGINE MOUNTING
After mounting the engine, inspect the followings.
• Transmission oil level (!2-9)
• Engine coolant level (!2-11)
• Clutch cable play (!2-13)
• Throttle cable play (!2-13)
• Drive chain slack (!2-16)
• Brake pedal height (!2-20)
• Wire, cable and hose routing (!19-12 to 15)
CAUTION
Direction of travel

Advertisement

Table of Contents
loading

Table of Contents