First Operation And Use - Maktek MKK Series Installation Use And Maintainence Manual

Solid fuel boiler
Table of Contents

Advertisement

7.FIRST OPERATION OF THE BOILER AND USING
ATTENTION! Please make sure that the boiler and system is filled with water, boiler in-out valves
are open, energy to boiler panel is 220 w and grounding line is standart.
Please flood the system with water until water comes out of warning pipe.
Please check if there is any leakage in the system.
Purge out all air from the system and add some water for decreased pressure
Please mark the value on hydrometer after air purge. This marking will be a warning data in
case of loss in water.
Before burning the boiler, make sure that all valves that are supposed to be open, especialy
boiler inlet-outlet valves are open.Next, please check if the circulation pump is properly
functioning and pumping the water to right direction.
For places with low chimney draught, fan must be cancelled until the problem is
fixed.
Gas draught of the chimney must be high. A simple way to detect this is to cover the entrance of
the chimney with a news paper and see if the paper hangs in the air or not. If the paper hangs in
the air, the draught of the chimney is suitable for the boiler.
7.1 FIRST OPERATION
High quality,with high heating vale, dust free,small particle coal must be
selected. The coal to be used in the boiler is very important as it will effect boiler efficiency, ash
quantity and burning quality.
The boilers burning chamber is capable of meeting a days coal demand. The boiler must be
burned with full fuel in first burning. Avoid adding coal to the pot during burning. However, if
necessary this quantity must be as low as possible. Otherwise, these additions will increase
smoke formation and will cause the boiler and the pipes to get dirty.
Please load fuel from the front to the back after making sure that the moving grill handle and gril
is in closed position.

Advertisement

Table of Contents
loading

Table of Contents