Daewoo DE12T Manual page 148

Hide thumbs Also See for DE12T:
Table of Contents

Advertisement

b. Install the nozzle holder on the plate
with the cap nut facing upward.
c. Install the holder into the cap nut.
d. Install a nut (157892-1000 : SW
17mm) on the holder.
e. Assemble the pin (157892-4200 or
157892-4300) to the dial gauge
(157954-3800).
Part No.
157892-4200
157892-4300
NOTE :
"L" means the length of the pin
except the threaded portion.
MAINTENANCE OF MAJOR COMPONENTS
L (mm)
160
110
- 144 -
EQM4045I

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

De12tiDe12tiaDe12tis

Table of Contents