Start-up Operation

5.1

Start-up

Before beginning of start-up the wiring of the Controller including all field devices must be completely terminated!
After switching the power supply "ON" and the end of the Power On Time, then the Controller is ready for use.
The electrochemical sensor needs a warm up time of 1 hour.
The Controller is delivered with standard parameters and stages/set points. The assignment of the relays to the
individual stages must occur with start-up unless arrangements have been made with the factory for programming.
All other parameters are to be examined and adapted to the local conditions.
Polygard® is a registered trademark of MSR
Customer Services (858) 578-7887 & (888) GO INTEC
12700 Stowe Drive, Suite 100, Poway, CA 92064 | Ph: (858) 578.7887 & (888) GO.INTEC | relevantsolutions.com/inteccontrols
12700 Stowe Drive, Suite 100, Poway, CA 92064 | Ph: (858) 578.7887 & (888) GO.INTEC | relevantsolutions.com/inteccontrols
INTEC Controls, 12700 Stowe Dr., Suite 100, Poway, CA 92064
INTEC Controls | 12700 Stowe Drive, Suite 100, Poway, CA 92064 | Ph: (858) 578.7887 & (888) GO.INTEC | inteccontrols.com
Specifications subject to change without notice. | USA 160104 | Page 24 of 30
Specifications subject to change without notice. | USA 131119 | Page 24 of 30
Specifications subject to change without notice. | USA 200211 | Page 24 of 30
PolyGard
Fax (858) 578-4633 & (888) FX INTEC
www.inteccontrols.com
Page 24
®
is a registered trademark of MSR-Electronic GmbH | LGC/LG2-04
Polygard® is a registered trademark of MSR | LGC/LG2-04
Specification subject to change without notice.
LGC/LG2-04
Printed in USA 131119

Advertisement

Table of Contents
loading

Table of Contents