Remove 1 screw (M3x6-Hex socket head cap) with plain washer used for locking the power board using 2.5mm
Allen key as shown in Figure 17 and swing the power board assembly towards right.
•
Carefully lift the base unit and route the input power cable and communication cables (if remote console is used
from the hole provided for wiring as shown in Figure 18 .
•
Mount the base unit plate on the wall using 4 lag bolts (M10x80) with M10 plain washer at mounting holes
using 17 mm box spanner as shown in Figure 18 (Do not tighten fully).
•
Verify the level by placing round spirit level on the bearing block and then tighten the 4 lag bolts using 17mm
box spanner as shown in Figure 19 .
•
Swing the power board assembly close and lock with 1 screw (M3x6 Hex socket head cap) with M3 plain washer
using 2.5mm Allen key as shown in Figure 20 .
•
Install the "base unit cover clamp" with 2 screws (M3x6 Hex socket head cap) with M3 plain washers using
2.5mm Allen key as shown in Figure 21 .
•
Refer to Figure 22 and using a screwdriver make the following connections.
1)
Connect back the RJ-25(6P6C) cable to the J4 connector
2) Connect the line and neutral wires coming from switch to the J5 connector on the power board.
Note: Refer to 5.3 / 5.4 Procedure for Input Wiring for additional wire connections.
Page 13 of 34