Start Of Operations; Personnel Qualification; Before Initial Start Of Operations - Schmalz SBPG Assembly Instructions Manual

Gripping system
Table of Contents

Advertisement

Start of Operations

7   Start of Operations
7.1   Personnel Qualification
Unqualified personnel cannot recognize dangers and are therefore exposed to higher risks!
1. Only instruct qualified personnel to perform the tasks described in these operating instructions.
2. The product may only be operated by persons who have undergone appropriate training.
3. Electrical work and installations may only be carried out by qualified electrical specialists.
4. Assembly and maintenance work must only be carried out by qualified personnel.
7.2   Before Initial Start of Operations
Before the initial start of operations following the installation, repair, servicing or maintenance work, you
must check the following:
All mechanical connectors are properly attached and secured.
All screws and nuts are tightened to specified torques.
All components are installed.
The safety distances have been maintained.
The electrical cable and supply hoses are properly routed.
The EMERGENCY STOP switch for the overall system is working.
The type plate is clearly legible.
DANGER
Electric shock from touching live components
Serious injury or death!
4 Make sure that the electrical components are not live before installation, maintenance
and troubleshooting.
4 Switch off the mains switch and secure against unauthorized restart.
CAUTION
Noise pollution due to incorrect installation of the pressure and vacuum connec-
tions
Hearing damage
4 Correct installation.
4 Wear ear protectors.
CAUTION
Vacuum close to the eye
Severe eye injury!
4 Wear eye protection.
4 Do not look into vacuum openings, e.g. suction cups.
22 / 36
EN-US · 30.30.01.02459 · 00 · 08/20

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sbpg xSbpg mSbpg x pseSbpg m pseSbpg x pse 50 sveSbpg x 50 sve ... Show all

Table of Contents