®
Attach Column
9d
8a) Thread glide into pole base, then
8b) locate into bottom of aluminum column.
9a) Position column with glide base on the floor, and
9b) Adjust glide to align pass through opening and slots
to extension box installed in step 1, 9c) install
(4) .250- 20 x 1" hex socket button head cap screws
(provided) securing aluminum channel to the extension
box, 9d) install hex socket button head cap screw through
upper slot inside aluminum channel to angle bracket
9b
installed in step 6d.
TIP: Install connector end of power harness through
cutout openings before data cables.
9c
9a
TIP: Remove ceiling tile if entering ceiling grid,
see step 10.
8a
8b
Page 7 of 11
1360037001 Rev A
Need help?
Do you have a question about the Ology FrameOne and is the answer not in the manual?