Upload Signature Data; Upload Signature Header Data - GE FVP110 Maintenance Manual

Table of Contents

Advertisement

GE Energy
c. Measure extended actuator signature: Setting EXT_ACT_SIGN_SET:
d. Step response test: Setting STEP_RESP_SET:
e. Measure positioner signature: Setting POSITIONER_SIGN_SET
f.
Exit

Upload Signature Data

This method guides you through uploading the signature data that has been measured
and stored in the positioner, from selecting the database you want to upload, to adjusting
the data pointer to the leading position of the desired data and uploading it.
Signature data uploading procedure:
1. Select action from menu.
2. Upload data: Uploading data from SIGN_DATA_X and SIGN_DATA_Y
3. Select upload database (meaning, select the database to be uploaded)
4. Change data pointer
5. Exit

Upload Signature Header Data

This method guides you through uploading the header data of a signature measurement
that has already been performed.
The header data contains the measurement condition settings, the ambient temperature
at the measurement, the date of the measurement, and so on. You can select a database
to access the desired header data.
Signature header data uploading procedure:
1. Selection of action from menu.
2. Upload header data: Select upload database (meaning, select the database to be
uploaded)
3. Exit
Executing signature measurement (SIGN_MEAS_EXEC)
Uploading data (see "Upload Signature Data" on page 236).
Executing step response test (SIGN_MEAS_EXEC)
Uploading data (see "Upload Signature Data" on page 236).
Executing signature measurement (SIGN_MEAS_EXEC)
Uploading data (see "Upload Signature Data" on page 236).
FVP 110 Fieldbus Valve Positioner Manual
236

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents