Setting Down The Load; Manual Handling - probst SPEEDY VS-140/200 Operating Instructions Manual

Vacuum hand laying device
Hide thumbs Also See for SPEEDY VS-140/200:
Table of Contents

Advertisement

Available languages

Available languages

Operation
aid in low gear).
2. Compensate for any swinging motion using the oper-
ator handle.
3. Immediately after lifting the load (e.g. from a pallet
or out of a truck), lower the load until it is just over
the floor (approx. 20 to 30 cm).
4. Secure the load securing chain (11) on the chain box
(11.1).
 The load securing chain must hold the load tight-
ly.
5. Stow the ends of the chain in the chain box so that it
does not interfere with handling.
 The load can now be transported close to the ground (around 50 cm above the ground).
guide the lifting device with the operator handle.
Never transport loads above people.
Do not operate unless you have a clear view of the whole working area.
Keep the lifting device as close to the floor as possible.

7.10 Setting Down the Load

CAUTION
Slipping or tilting of the load when set down
Risk of injury!
Before releasing the load, ensure that it cannot slip or tilt.

7.10.1 Manual Handling

1. Carefully set down the lifting device with the load.
2. Before releasing the load, ensure that it cannot slip
or tilt.
30 / 41
5270.0015 / 5270.0016 / 5270.0017 / 5270.0018

Advertisement

Chapters

Table of Contents
loading

Table of Contents