Installing The Heatsink(S); Figure 50. Close The Load Plate And Socket Lever - Intel S1200BT Service Manual

Server board
Hide thumbs Also See for S1200BT:
Table of Contents

Advertisement

10. Close the load plate (see letter "A" in
the load plate tab engages under the socket lever when fully closed (see letter "B"
and "C" in
Note: Make sure the alignment triangle mark and the alignment triangle cutout align correctly.
To assist in package orientation and alignment with the socket:

Installing the Heatsink(s)

1. If a protective film covers the thermal interface material (TIM) on the underside of
the heatsink, remove the protective film.
2. Align heatsink fins to the front and back of the chassis for correct airflow. Airflow
goes from front-to-back of chassis.
3. Each heatsink has four captive fasteners and should be tightened as shown.
74
Figure
50).
AF004576

Figure 50. Close the Load Plate and Socket Lever

Figure
50), close the socket lever, and ensure
A
AF004578
Intel® Server Board S1200BT Service Guide
AF004577
AF004579
Save the
protective
cover.
AF004580

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents