Control Connections; Control Cables; Assignment Of The Control Terminals - Lenze 8210 HVAC Series Operating Instructions Manual

Global drive frequency inverters hvac and pump drives power range 0.75 - 11 kw
Table of Contents

Advertisement

Show/Hide Bookmarks
Installation
4.2.3

4.2.3.1 Control cables

4.2.3.2 Assignment of the control terminals

6 2
7
8
9
K 1 1
K 1 2
K 1 4
FIG 4-6
4-12
821XKlimaBA0399

Control connections

- We recommend the unilateral screening of all cables for
analog signals to avoid signal distortion.
- Connect the screens of the control cables as follows:
- 8211 - 8214:
On the front FAST-ON connector.
- 8215 - 8218:
On the front metal surface (screw length max.12 mm).
- If the control cables are interrupted (terminal strips, relays),
the screens must be reconnected over the shortest possible
distance.
- Connnect the fixing screw of the setpoint potentiometer to
PE.
2 0
2 8
E 1
E 2
E 3
E 4
3 9
K35.0026
Position of the control terminals

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents