Skyjack SJKB-40-D Operating Manual page 6

Engine powered work platform
Table of Contents

Advertisement

WARRANTY STATEMENT
SKYJACK, Inc. warrants each new work platform to be
free of defective parts and workmanship. During the
first full year, labor and replacement parts will be provided
by the local authorized Skyjack dealer without charge.
For the following 48 months, structural components found
to be defective will be replaced or repaired at no charge.
A warranty registration card is supplied with each work
platform. The warranty is only effective when the warranty
card has been completed and returned to Skyjack within
15 days from the time of billing. When work platforms
are put into stock, the warranty period does not start
until the work platform has been shipped to the dealers
customer. If a unit is put into service and no warranty
card has been mailed to Skyjack, Inc., the warranty period
will commence 15 days from the date the dealer was
invoiced for the work platform.
All warranty claims are subject to approval by Skyjack's
Service Department. Skyjack, Inc. reserves the right to
limit or adjust claims with regard to defective parts, labor
or travel time based on usual and customary guidelines.
Parts purchased from sources other than Skyjack will
not be covered under this warranty. Misuse or improper
operation, lack of normal maintenance and inspections
as outlined in this manual, alterations to original design
and/or components or accidents will void all warranty.
Batteries are not covered by this warranty.
The above mentioned warranty statement is exclusive
and no other warranty whether written, oral or implied
shall apply. Skyjack excludes any implied warranty of
merchantability and fitness and accepted no liability for
consequential damages or for other negligence.
WARRANTY PROCEDURES
The selling distributor or authorized dealer shall be
responsible for the complete handling of customer claims
under this warranty. Here's what to do:
1. When a customer files a claim under this warranty,
contact Skyjack's Service Department to verify
warranty coverage. NOTE: The complete serial number
of the work platform is required to verify the claim.
2. When Skyjack's Service Department verifies warranty
coverage, they will also issue an RA (Return
Authorization) number for the return of any defective
component(s). All items over $25.00 in value must
be returned to Skyjack, Inc.
Page iv
JUN. 1999
3. Fill out a Warranty Claim Form from dealer's supply of
claim forms. Then notify Skyjack's Service
Department of the warranty claim number on the form
used.
4. The distributor/dealer should then file a warranty claim
with Skyjack, Inc. describing the nature of the defect,
probable cause, work performed, travel hours, and
labor hours listed separately. Warranty labor will be
paid at a rate of $42.00 per hour. The travel allowance
will be paid at the same hourly rate within the dealers
specified territory, limited to a maximum of four (4)
hours. If a part has serviceable components,
PLEASE replace the bad component. For instance,
if you have a bad switch on a controller, please replace
the switch. Hydraulic cylinders should be repacked,
unless they are damaged beyond repair. Engine
failures should be directed to your local engine
distributor and covered by the manufacturers warranty.
Skyjack will accommodate you and your labor. Labor
rates and travel allowances are subject to change
without notice.
5. Warranty claims must be received by Skyjack within
15 working days from the date of the repair. Warranty
claims received with insufficient information will be
returned for correction or completion.
6. Materials returned for warranty inspection must have
the following procedures:
A. Carefully packaged to prevent additional damage
during shipping.
B. Drained of all contents and all open ports capped
or plugged.
C. Shipped in a container tagged or marked with the
RA number.
D. Shipped PREPAID. Any item(s) returned for
warranty by any other means may be refused and
returned unless prior approval from Skyjack is
obtained.
E. Items shipped to the dealer will be sent freight
prepaid and added to the invoice.
Failure to comply with the above procedures may delay
approval and processing of the warranty claim and could
result in the denial of a warranty claim. Skyjack's dealer's
accounts must be kept current in order to approve and
issue warranty credits. Skyjack reserves the right to
withhold issuance of warranty credits to a dealer if their
account is not in good standing. This is subject to change
without prior notice.
SJKB-40-D, SJKB-40-D/F
DEC. 1999
NOTE
Platform leveling from platform control console is
not available on European models.
25.
TO ROTATE THE PLATFORM TO THE LEFT:
Press and hold the Turret Rotate Toggle Switch
to the " ï " (left) position. Release the switch
to stop.
26.
TO ROTATE THE PLATFORM TO THE RIGHT:
Press and hold the Turret Rotate Toggle Switch
to the " ð " (right) position. Release the switch
to stop.
27.
TO RETRACT THE BOOM ARM: Press and hold
the Boom Extend/Retract Toggle Switch to the
"ñ " (retract) position. Release the switch to stop.
28.
TO EXTEND THE BOOM ARM: Press and hold
the Boom Extend/Retract Toggle Switch to the
" ò " (extend) position. Release the switch to
stop.
29.
TO SOUND THE HORN: Depress the red push-
button on the Drive/Steer Controller.
30.
TO OPERATE USING THE EMERGENCY
PUMP: Raise the cover on the Emergency Pump
Select Toggle Switch. Press and hold the switch
to the " ï " (left) position. When the switch is
released, power to the emergency pump will be
disconnected. This function is intended to be
used in the event of an engine failure to lower
the work platform for repairs to be made. This
function is not intended to be used for an
extended period of time.
Shutdown Procedure
1.
Fully lower the platform.
2.
Push in the Emergency Stop Buttons.
3.
Rotate the Off/Platform/Base Key Switch to the
"
"(off) position. Remove the key.
4.
Rotate the Battery Disconnect Switch to the
"OFF" position.
SJKB-40-D, SJKB-40-D/F
Loading and Tie Down Procedure
1.
With the telescopic boom fully retracted and
trailer on firm level ground. Align the tires of the
boom with the back end of the trailer.
2.
Select low speed on the platform throttle control
and slightly raise the jib for ground clearance
while loading. Slowly and carefully drive the
machine on to the trailer. In the event of an engine
failure the Emergency Pump can be used to raise
the boom, and steer the work platform while
loading.
NOTE
For loading and unloading using a winch line, see
the drive relief override and brake release procedures
in this section.
REMEMBER
Operating any hydraulic function will reset the
parking brake.
3.
With machine loaded on trailer, tie down as
recommended. (Refer to Figure 2-11.)
4.
Remove turret lock retaining pin. Lower turret
lock into locked position and reinstall turret lock
retaining pin.
Figure 2-11. Recommended Tie Down Locations
JUN. 1999
SECTION 2, Page 9
Ma40-212

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sjkb-40-d/f

Table of Contents