Installing The Equipment - Vatech EzRay Air Wall VEX-S300W Installation Manual

Hide thumbs Also See for EzRay Air Wall VEX-S300W:
Table of Contents

Advertisement

3.

Installing the Equipment

Before Start
Tape Ruler
Drilling Template
Spirit Level
Marker
EzRay Air Wall (Model: VEX-S300W) Installation Manual
Observe wall properties
During installation, the technician is responsible for the
assessment of wall properties and selecting the method of
attaching the unit to the wall.
The wall construction must be able to resist a shear load of
76 kg (168 lbs) and tractive force of 204 kg (450 lbs) at each
attachment location. Otherwise, some additional mounting
supports must be used to fulfill this requirement.
You are advised to plan and study the installation
environment carefully in advance before proceeding since
the installation involves drilling the wall. Accurate
measurement is of critical importance for a successful
installation.
The horizontal arm comes with one of three different
lengths, depending on your purchase: L=450, 600, or 900
mm.
Perform marking on the wall after performing accurate
simulation several times with the arm provided.
The spirit level should be placed on the location indicated
in the figures to obtain the accurate level.
<Single Stud>
3. Installing the Equipment
<Double Stud>
21