Installation With Butt Weld Spigots - GEM B54 Operating Instructions Manual

Motorized ball valve
Hide thumbs Also See for B54:
Table of Contents

Advertisement

11 Installation in piping
Tools
▶ The tools required for installation and assembly are not
included in the scope of delivery.
Use appropriate, functional and safe tools.
1. Ensure the product is suitable for the relevant application.
2. Check the technical data of the product and the materials.
3. Keep appropriate tools ready.
4. Wear appropriate protective gear, as specified in the plant
operator's guidelines.
5. Observe appropriate regulations for connections.
6. Have installation work carried out by trained personnel.
7. Shut off plant or plant component.
8. Secure plant or plant component against recommission-
ing.
9. Depressurize the plant or plant component.
10. Completely drain the plant (or plant component) and let it
cool down until the temperature is below the media vapor-
ization temperature and cannot cause scalding.
11. Decontaminate, rinse and ventilate the plant or plant com-
ponent properly.
12. Lay piping so that the product is protected against trans-
verse and bending forces, and also from vibrations and
tension.
13. Only mount the product between matching aligned pipes
(see following chapters).
14. Flow direction and installation position are optional.
GEMÜ B54
NOTICE

11.2 Installation with butt weld spigots

▶ Adhere to good welding practices!
1. Installation variant:
Undo one bolt, remove the other bolts and swivel the
centre section aside instead of removing it.
2
1
2. Align the pipes 1 and 4 on the left and right with the butt
weld spigots 2 and 3, and attach them to the spigots.
26 / 43
NOTICE
4
3
www.gemu-group.com

Advertisement

Table of Contents
loading

Table of Contents