GEIGER INline System GSI56 r Series Original Assembly And Operating Instructions

GEIGER INline System GSI56 r Series Original Assembly And Operating Instructions

Advertisement

Quick Links

GEIGER INline System GSI56..r
with mechanical end stop for the facade technology
Original-Montage- und
DE
Betriebsanleitung
Original assembly and
EN
operating instructions
Notice originale de montage
FR
et d'utilisation
Instrucciones originales de
ES
instalación y funcionamiento
Istruzioni originali di installazione
IT
e funzionamento
www.geiger.de
EN
1
EN

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the INline System GSI56 r Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for GEIGER INline System GSI56 r Series

  • Page 1 GEIGER INline System GSI56..r with mechanical end stop for the facade technology Original-Montage- und Betriebsanleitung Original assembly and operating instructions Notice originale de montage et d’utilisation Instrucciones originales de instalación y funcionamiento Istruzioni originali di installazione e funzionamento www.geiger.de...
  • Page 2: Table Of Contents

    1. General information Dear customer, By purchasing a GEIGER motor you have decided on a quality product from GEIGER. Thank you very much for your decision and the confidence placed in us. Before you put this drive into operation please observe the following safety instructions. It serves for the prevention of danger and for the avoidance of personal injury and damage to property.
  • Page 3: Intended Use

    GJ 56 Design options Torque in Nm Motor diameter GEIGER INline System 4. Safety instructions ATTENTION: Important safety instructions. For personal safety, it is important to follow these instructions. Please keep these instructions for future reference. f Do not allow children to play with stationary controls. Keep remote controls away from children.
  • Page 4: Safety Instructions For Assembly

    A plug for the disconnection of the motor from the power supply must be accessible after installation. f Damaged connecting cables must be replaced by GEIGER connecting cables of the same type. f The device must be mounted as described in the installation instructions. Fixations shall not be made with adhesives since they are regarded as unreliable.
  • Page 5: Assembly Instructions

    The system components supplied by GEIGER may not be repro- cessed or altered, otherwise the warranty expires. Before installation, the motor and the other system parts should be checked for visible damage.
  • Page 6: Information For The Specialist Electrician

    UP and DOWN directions. Connecting cables with plug connectors of the Hirschmann Company are tested and approved with couplings of the Hirschmann Company. Electronic / mechanical limit stop Gerhard Geiger GmbH & Co. KG | 100W1577 V000 0920...
  • Page 7: Setting The End Positions

    2. Press the black setting key. 3. Move the blind downwards to the selected final position. 4. Move the blind about 6 seconds upwards until the black setting key jumps back audibly (click). The lower end position is stored. www.geiger.de...
  • Page 8: What To Do If

    After setting of the lower end position the • The motor has been installed upside down blind only runs in DOWN direction. (see assembly note). 10. Maintenance The drive is maintenance-free. Gerhard Geiger GmbH & Co. KG | 100W1577 V000 0920...
  • Page 9: Technical Data

    The average sound pressure level data are intended for guidance only. The values were determined by GEIGER at a distance of 1 m, with a hanging motor at idle speed and averaged over 10 seconds. There is no reference to any specific test standard.
  • Page 10: Declaration Of Conformity

    Gerhard Geiger GmbH & Co. KG Schleifmühle 6 | D-74321 Bietigheim-Bissingen Phone +49 (0) 7142 9380 | Fax +49 (0) 7142 938 230 | info@geiger.de | www.geiger.de Sitz Bietigheim-Bissingen | Amtsgericht Stuttgart HRA 300591 | USt-IdNr. DE145002146 Komplementär: Geiger Verwaltungs-GmbH | Sitz Bietigheim-Bissingen | Amtsgericht Stuttgart HRB 300481 Geschäftsführer: Roland Kraus | WEEE-Reg.-Nr.
  • Page 11: Notes On Waste Disposal

    In the interest of environmental protection, please contact your local government’s recycling or solid waste management department to learn more about the services it provides. Waste disposal of electric and electronic equipment Electrical and electronic equipment must be collected and disposed of separately in accordance with EU regulations. www.geiger.de...
  • Page 12 They will be happy to assist you. Gerhard Geiger GmbH & Co. KG Schleifmühle 6 | D-74321 Bietigheim-Bissingen T +49 (0) 7142 9380 | F +49 (0) 7142 938 230 info@geiger.de | www.geiger.de Gerhard Geiger GmbH & Co. KG | 100W1577 V000 0920...

This manual is also suitable for:

Inline system gsi5606rInline system gsi5610r

Table of Contents