Download Print this page

WOODLAND SCENICS RIVER PASS S1487 General Instructions Manual page 20

Building kits

Advertisement

WOODLAND
SCENICS
Please follow the River Pass General Instructions. You may be referred to the drawings and notes printed
here. Please read through all instructions before beginning to build your kit.
Chimneys
Lightly sand bottom edge of chimney backs until flat (RP9-7). Sand or file the smooth sides of chimney
backs and molded-in chimney fronts so back and front fit tightly and are flush with each other. Glue
together. When glue is dry, sand tops of chimneys flat.
Cornice
The cornice (RP9-6) fits into the slots located near the tops of walls RP9-1 and RP9-2. For the cornice
to fit properly, the right edge of slot on RP9-1 will have to be filed to match the left edge of slot on
RP9-2. Test fit to make sure brick courses line up and that the cornice fits properly. When satisfied with
fit, glue walls together. Insert cornice and glue. To attach awnings, refer to the Gereral Instructions.
RP9-4
(sand both edges)
RP9-6
Cornice
RP9-1
®
RP9-7
RP9-3
(sand front edge)
(sand second story
RP9-5
#RP9
Rosie's
File slot
of RP9-1
RP9-2
front edge)

Advertisement

loading