Download Print this page
WOODLAND SCENICS LANDMARK STRUCTURES FIRE STATION N 3 Quick Start Manual

WOODLAND SCENICS LANDMARK STRUCTURES FIRE STATION N 3 Quick Start Manual

Advertisement

Quick Links

FIRE STATION Nº 3
PF5212
Fire Station Nº 3 represtents the elegantly styled
firehouses that communities built as a 'point of
pride,' across America. The exquisite architectural
details include a wide cornice, curved window
caps and an ornate cupola to house the tall tower
where fire hoses drainded following a fire. The
Fire Station Nº 3 design includes hinged bay doors
and molding that allows easy installation of wiring
for interior lighting.
WOODLAND SCENICS
®
®
®
MODELING AND CARE
INFORMATION
This kit suggests the use of materials
that may stain or cause damage. Take
care to cover project area and clothing
appropriately. Follow recommendations
for use and cleanup.
CAUTION:
recommended. Use with care.
We make every effort to ensure our kits are
manufactured complete. However, if this kit
is missing a part, please make note of the kit
name, number and missing part and contact the
Woodland Scenics Sales and Customer Service
Department at PO Box 98, Linn Creek, MO 65052,
573-346-5555 or sales@woodlandscenics.com.
®
XPF5212INST
1 : 160
BUILDING KIT
Cutting tools
G4
©2014 O CO

Advertisement

loading

Summary of Contents for WOODLAND SCENICS LANDMARK STRUCTURES FIRE STATION N 3

  • Page 1 However, if this kit is missing a part, please make note of the kit name, number and missing part and contact the Woodland Scenics Sales and Customer Service Department at PO Box 98, Linn Creek, MO 65052, 573-346-5555 or sales@woodlandscenics.com.
  • Page 2 ® ® ® FIRE STATION Nº 3 Building Kit Contents ❑ Wall and Roof Sections ❑ Sprues with Details ❑ Printed Window Material ❑ Clear Window Material ❑ Dry Transfer Decals ❑ Flag ❑ Blackout Paper Building Footprint: 3-19/32 in W x 3-7/32 in D x 4-13/16 in H (9.11 cm x 8.17 cm x 12.2 cm)
  • Page 3 Four void pieces, please disregard! Before You Begin • Read through instructions booklet. • Check kit contents and verify Details. • Collect additional supplies. • Cover project area with newspaper. TIP! To assist in assembly, refer to exploded-view illustration on back of box. Additional Needed Supplies ❑...
  • Page 4 1. Prepare Building Parts and Details Fig. 1a • Remove mold flash from Wall and Roof Sections and Details using a hobby knife and sandpaper (Fig. 1a). Do not remove Details from sprues at this time. • Wash Wall Sections, Roof and Details in warm, soapy water using a mild detergent.
  • Page 5 5. Install Hinged Doors Fig. 5a Fig. 5b Fire Station Doors are hinged to swing inward. Glue in place carefully. • Position Front Wall facedown. • Set Door onto backside of Front Wall. Make sure the hinge pins are in the grooved openings (Fig.
  • Page 6 8. Assemble Walls and Roof • Snap Wall and Wall into place on Front Wall (Fig. 8a). • With cutout in Roof facing forward, slide it into place following the grooves on Walls and securing in groove on Front Wall (Fig.
  • Page 7 11. Install Details cont. Left Side (Fig. 11b) Bench , Boots Front (Fig. 11c) Fig. 8a Fig. 8a Front Door Light 12. Assemble Flag Fig. 12a Fig. 12b Fig. 12c • Cut out Paper Flag with scissors. • Apply white glue onto backside of Flag, fold in half and form around Flagpole and smooth surface...
  • Page 8 Look for These Other N Scale Landmark Structures Building Kits at Your Local Hobby Shop Sonny’s Super Service O'Leary Dairy Fresh Market PF5200 Distribution PF5203 PF5205 Planters Feed and Main Street County Courthouse Seed Supply Mercantile PF5201 PF5202 PF5209 Sicken Tire Company Country Cottage Woodland Station PF5204...

This manual is also suitable for:

Pf5212