Chapter 3
Final Installation and Power Up

Verify Installation

• Is the Sensor IQ Breaker Panel securely mounted with all mounting hardware tight?
• Remove all metal shavings and debris from the unit.
• Is there sufficient clearance in the front of the unit for door access?
• Check wiring:
- Are all load wires terminated to the correct breaker? See
240 V, and 277 V)
- Are all load circuits free of short circuits?
- Do all control cables meet specifications? See
- Are all low-voltage control cables routed separately from high voltage cables?
- Are all data terminations terminated? See

Install the Front Panel

1:
If a main breaker has been installed, remove the
main breaker access panel from the front panel
before installing the front panel to the Sensor
IQ.
• The main breaker access panel is attached to
the rear of the panel with four nuts that
thread onto PEM studs on the rear of the
front panel.
2:
Using the six or eight previously removed
screws, reattach the front panel to the Sensor
IQ.
36
page 26
on
.
Load Wire Specification (120 V,
Data and Control Wire Specification
Connect Data Wiring
on
Rear View of Sensor IQ Front Panel
page 31
on
page 30
.
Main Breaker
Access Panel