Rough-In And Terminate Cable - ETC Sensor IQ IQ12-ML Installation Manual

Intelligent breaker panel
Table of Contents

Advertisement

5:
Test installation by pulling firmly on the outer edge of the breaker. When installed correctly, the
breaker should not easily release without the use of tools (such as a screwdriver).
6:
Install provided breaker blanks in any positions where you will not use a breaker.

Rough-in and Terminate Cable

The recommended cable for each termination is limited to the wire lugs and termination connectors
provided in the Sensor IQ Breaker Panel. Refer to the chart included with each termination section for
wire specification, strip length, and torque settings.
WARNING:
20
RISK OF DEATH BY ELECTRIC SHOCK! Failure to disconnect all power to the
panel before working inside the panel could result in serious injury or death.
De-energize main feed to the breaker panel and follow appropriate Lockout/
Tagout procedures as described in NFPA Standard 70E. It is important to note
that electrical equipment such as breaker panels can present an arc flash
safety hazard if improperly serviced. This is due to available large short circuit
currents on the feeders of the equipment. Any work on energized equipment
must comply with OSHA Electrical Safe Working Practices.
Insert screwdriver and pry
outward to release the
breaker from the interior.