Cable Routing and Conduit Access

When planning conduit entry and cable routing to the Sensor IQ Breaker Panel, pay special attention to
the recommendations shown in the figure below. Arrows indicate acceptable conduit entry locations.
Bottom-Feed Mounting
Panel mounted
with
low-voltage
cable trough on
the top
Data access
panel
The low-voltage wiring trough is located between the edge of the panel and the User Interface. The
panel can be mounted with the trough on the top or the bottom, allowing for data and low-voltage
cable routing flexibility.
Purpose
Feed wiring
Load wiring
Control wiring (DMX,
Network, option cards, etc.)
Note:
Prepare to Install
Control
wiring
Cable Routing Options
Top Entry
Outside of low-voltage
cable trough only
Through low-voltage
cable trough only
Control wiring (DMX, Ethernet, etc.) and power wiring must be run in separate
conduit in accordance with local code.
Top-Feed Mounting
Data
access
panel
Control
wiring
Bottom Entry
Outside of low-voltage
cable trough only
Through low-voltage
cable trough only
The User Interface can
be rotated depending
on rack installation
orientation.
Take care when
disconnecting wire
harnesses behind the
User Interface as to not
break any wire
connections.
Panel mounted with
low-voltage cable
trough on the bottom
Top
Bottom
Side Entry
Side Entry
Yes
Yes
Yes
Yes
No
No