Chute And Tube Installation - Briggs & Stratton 1695284 Operator's Manual

50” 2-bin bagger
Table of Contents

Advertisement

Chute and Tube Installation

D
A
B
Figure 9. Install Chute
A. Mounting Plate
B. Locknuts, 5/16-18
C. Carriage Bolt, 5/16-18 x 5/8
D. Chute Rod
E. Rubber Strap
F. Discharge Deflector
G. Locknut
H. Mounting Hole
Chute Installation
1. Install mounting plate (A, Figure 9) to mower deck as
shown. Secure with 5/16-18 x 5/8 carriage bolts (C)
and 5/16-18 locknuts (B).
2. Lift discharge deflector (F).
3. Insert lower chute rod (D) into mounting plate (A).
4. Pull rubber strap (E) below discharge deflector, and
secure by placing hole (H) over locknut (G).
H
F
E
G
C
H
F
G
E
Figure 10. Connecting Tube Assembly to Lower
Chute and Cover
A. Upper Tube
B. Cover
C. Ridge, Upper Tube
D. Ridge Cutout
E. Lower Chute
F. Strap, Rubber
G. Pin
H. Tube Assembly
CONNECTING TUBE ASSEMBLY TO CHUTE AND COVER
1. Slide the upper tube (A, Figure 10) into cover (B)
aligning ridge (C) with cutout (D) as shown.
2. Slide tube assembly(H) over lower chute (E). Secure
tube assembly (H) to lower chute (E) using strap (F)
and pin (G).
8
D
C
B
A

Advertisement

Table of Contents
loading

Table of Contents

Save PDF