Chute And Tube Installation - Briggs & Stratton 1695287 Operator's Manual

42” 2-bin bagger
Table of Contents

Advertisement

Chute and Tube Installation

A
C
E
Figure 7. Install Chute
A. Chute
B. Discharge Deflector
C. Knob
D. Bolt, Carriage, 5/16 x 3/4
E. Nut, Push, 5/16
F. Nut, Wing
Chute Installation
1. Install 5/16 x 3/4" carriage bolts (D, Figure 7) with
5/16 push nuts (E) to mower deck as shown.
2. Lift discharge deflector(B).
3. Place the holes of the chute (A) onto carriage bolts
(D, installed in step 1), sliding the front edge of the
chute under the hinge bracket.
4. Secure knob (C) onto carriage bolt (D) as shown.
5. Secure wing nut (F) onto carriage bolt (D) as shown.
B
B
E
D
H
F
G
E
Figure 8. Connecting Tube Assembly to Lower
Chute and Cover
A. Upper Tube
B. Cover
C. Ridge, Upper Tube
D. Ridge Cutout
E. Lower Chute
F. Strap, Rubber
G. Pin
H. Tube Assembly
CONNECTING TUBE ASSEMBLY TO CHUTE AND COVER
1. Slide the upper tube (A, Figure 8) into cover (B)
aligning ridge (C) with cutout (D) as shown.
2. Slide tube assembly(H) over lower chute (E). Secure
tube assembly (H) to lower chute (E) using strap (F)
and pin (G).
8
D
C
B
A

Advertisement

Table of Contents
loading

Table of Contents

Save PDF