SECTION 3: INSTALLATION
Refer to Sections 7.15A, 7.15B and 7.15C
for Installation and Dimension diagrams,
and the following instructions:
1. Remove packing and inspect the
machine and control panel for
shipping damage.
2. Check fluid levels, if needed. Refer
to the Engine Operation Manual for
engine oil.

3.3 SERVICE BODY PREP

Consult Sections 7.15A, 7.15B and 7.15C
for
Installation
(dimensional)
following instructions:
1. Drill four (4) 1/2" mounting holes in the
service body floor in a square pattern
at the desired mounting location.
Ensure that all proper machine
clearances will be maintained.
3.4 STABILIZING PRECAUTIONS
FOR MACHINE MOUNTING
Machine should be mounted to vehicle using
a minimum of four (4) isolators. Isolators
absorb vibration and allow for a complete
sealing of the machine to the mounting
surface. Isolators are available from Vanair
order bolt down isolator, part number
PR271935
(quantity
permanently bolt machine down until after all
instructions
in
addressed.
3.5 MACHINE PACKAGE
MOUNTING
When determining package position on
vehicle, be aware of the minimum space
requirements
needed
circulation, and also package access for
performing
maintenance
7.15A, 7.15B and 7.15C for Installation and
Dimension
diagrams).
machine for mounting, follow the succeeding
procedure:
1. Unbolt the unit from the skid:
remove the mounting nuts, lock
PAGE - 14
and
Dimension
requirements,
and
of
4).
Do
Section
3
have
been
for
cooling
(see
Sections
To prepare the
090043-OP_r0 (MARCH - 2015)
washers, washers and mounting
bolts securing the machine to the
shipping crate.
2. Using a proper hoist, lift and place
the unit in a preliminary position on
the service body of the vehicle so
that access is easily attained and
there is enough space surrounding
the mounting area for cooling
purposes.
3. Leaving the unit in the preliminary
position, connect the ground cable
to the unit battery and check all fluid
levels (NOTE: vehicle should be on
a level surface in order to get
the
accurate fluid level checks).
4. Move the unit into its final location
for mounting, while positioning the
control trunk line and all other
connections.
Bolt the machine down with four (4) 3/8" bolts
inserted up from the bottom through the four
mounting bolt holes of the base frame. See
Sections 7.15A, 7.15B and 7.15C for
Installation and Dimension diagrams.
It is recommended that the machine be
®
:
mounted on a vibration isolating material
such as 1/4" neoprene rubber pads.
Not
Isolating Dampeners (Part Number
PR93969) are available by calling Vanair.
Start the unit and fully test all functions.
Warm the unit to full operating temperature.
After the unit has cooled, check all fluid
levels and add as needed.
3.6 CONNECTING THE FUEL
and
SYSTEM (IF REQUIRED)
To connect to the fuel pump, refer to Figure
3-1 and follow these steps:
1. Mount the electric fuel pump at the
desired location on the service
body, keeping it as close to the truck
fuel tank as possible. Mount the
electric fuel pump a maximum
®
AIR N ARC
150 SERIES
NOTE
VANAIR MANUFACTURING, INC.
(800) 526-8817 • www.vanair.com

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents