Table 6-1
Post-Repair Procedures
Replaced
Assembly or Part
Switch 5 (SPDT Switch Bias Pin
Adapter PCA) (E5092-66504)
Switch 6 (SPDT Switch Bias Pin
Adapter PCA) (E5092-66504)
Switch 7 (SPDT Switch Bias Pin
Adapter PCA) (E5092-66504)
Switch 8 (SPDT Switch Bias Pin
Adapter PCA) (E5092-66504)
Switch 9 (SPDT Switch Bias Pin
Adapter PCA) (E5092-66504)
Chapter 6
Required
Adjustments
Correction Constants
(CC)
No adjustment needed
Perform the following performance tests.
- Write SN
- Load Match, Insertion Loss and Isolation Test
for Switch 5 (SPDT, 5COM, 5A and 5B)
- LED Check
- DCBUS Check
No adjustment needed
Perform the following performance tests.
- Write SN
- Load Match, Insertion Loss and Isolation Test
for Switch 6 (SPDT, 6COM, 6A and 6B)
- LED Check
- DCBUS Check
No adjustment needed
Perform the following performance tests.
- Write SN
- Load Match, Insertion Loss and Isolation Test
for Switch 7 (SPDT, 7COM, 7A and 7B)
- LED Check
- DCBUS Check
No adjustment needed
Perform the following performance tests.
- Write SN
- Load Match, Insertion Loss and Isolation Test
for Switch 8 (SPDT, 8COM, 8A and 8B)
- LED Check
- DCBUS Check
No adjustment needed
Perform the following performance tests.
- Write SN
- Load Match, Insertion Loss and Isolation Test
for Switch 9 (SPDT, 9COM, 9A and 9B)
- LED Check
- DCBUS Check
Post-Repair Procedures
Post-Repair Procedures
Verification
195