Samoa LARIUS PNEUMATIC HOIST 200 Operating And Maintenance Manual page 10

Hide thumbs Also See for LARIUS PNEUMATIC HOIST 200:
Table of Contents

Advertisement

Pneumatic hoist twin mast for 200 litres
The operator must arrange a suitable environment before installing it as we show below:
An area wide enough to allow the loading and unloading drum and routine maintenance.
Make sure there is sufficient space in height to allow lifting and easy access to the air control groups.
For the air supply, use a hose with an internal diameter of not less than 10 mm.
Make sure that the air regulators (A) are closed. (Turn the adjusting knob clockwise to close it).
Fig. 2H
H1
Closed
Fig. 3H
Make sure the air pressure valve (H1) to the pressure plate
is closed.
www.larius.com
8
A
A
A
A
A
Closed
H2
Upwards
Stop
Downwards
Fig. 4H
Make sure the air hose to the air pump is attached to the
piston and the pump.
Make sure that the control lever (H2) is in the intermediate
position (Stop).
Closed
-
Closed
ED. 10 - 07/2020 - Cod. 150133

Advertisement

Table of Contents
loading

This manual is also suitable for:

Larius pneumatic hoist 200

Table of Contents