Maintenance; General - probst JUMBO-BV-VARIO Manual

Vacuum kerb stone installation machine
Table of Contents

Advertisement

Maintenance

JUMBO-BV-VARIO-B
V2
7
Maintenance
7.1

General

To ensure the correct function, safety and service life of the device the following points must be executed in
the maintenance interval.
Used only original spare parts, otherwise the warranty expires.
All operations may only be made in unpressurised, electro less and closed state of the device!
Only persons with the appropriate knowledge and
ability are allowed to repair the device
Service interval
daily
After one week
After one month
Minimum 1x per year
(at rough conditions shorten the
interval)
Before the device is used again, it has to be checked
by an expert.
Maintenance work
Check engine oil level (see Honda operating instructions)
Clean air filter and blower (see fig. 1-3).
Control and tighten all screws and connection
Grease all joints, bolts, guidance's.
Grease all grease nipple every month
Oil change according to manufacturer data (HONDA) replacement
(note the specifications).
Check of all the suspension parts, bolts and straps. Check for
corrosion and safety by an expert. (=> BGR 500)
26/07/16
36 / 40

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Jumbo-bv-vario-b5220.0011

Table of Contents