Installation
JUMBO-BV-VARIO-B
V2
●
The mast is adjusted in the optimal position, when
the plumb bob is in plump.
5.6
Fixing the lifting hose unit
Fig. 24
(A)
(8)
●
Insert lifting hose (8) at end of
crane jib (4).
Fig. 27
Connect operating valve unit with
lifting hose.
Fig.25
(4)
●
Pull socket pin (9) on crane jib (4)
back, insert lifting hose (8) and
secure with socket pin (9).
Fig. 28
(10)
●
Connect lifting hose (8) with
operating valve unit (10)
secure with clips.
(9)
(A)
(8)
●
Connect vacuum hose (A) with
lifting hose (8) and secure with clips.
(8)
●
Connect operating valve unit
(10) and suction plate
and
. Regard that the hooks
with clips
are fit correct.
26/07/16
24 / 40
Fig. 26
(8)
Fig.29
and secure