Commissioning and Testing
Provision Ethernet Interface at OLT
Provision and unlock the Ethernet port to be used at the OLT. For the provisioned Ethernet
link, use external equipment (for example, a laptop computer) to verify the Ethernet link is
active.
NOTE
Refer to the Total Access 5000 GPON 2.5G 2‐Port Access Module Installation and
Maintenance Guide (P/N 61187500E1‐5) or the Total Access 5000 GPON OLT 2X
SFP Installation and Maintenance Guide (P/N 61187501G1) for details on
provisioning the ONT.