Required Tools

The following are included in the SFU ONT packaging:
• 2 Two‐screw Terminal Bridges
• Fiber cable management and strain relief
• Fiber connector
• Electronics/optics
NOTE
For data and video over IP, the connection to the SFU is through the RJ‐45
Ethernet connectors. For POTS, the connection is made through 2 Two‐screw
Terminal Bridges, or RJ‐11 connections. 
Standard technician tools are used for a ONT installation (for example, drill, drill bits, side 
cutters, screwdrivers, nut drivers, hex wrenches, wire strippers, etc.). Required tools consist of 
the following:
• Carpenter's level
• 3/32" screw driver
• 5/32" hex tamper‐proof bit
• 216‐Type can wrench
• Fiber splicing tools
• RJ‐45/RJ‐11 connector crimper
• RJ‐45 plugs
• Two RJ‐11 plugs (when not using Two‐screw Terminal Bridges)
• Two #10 screws and appropriate surface anchors for mounting the SFU ONT, and two #6 
• A telephony/data communication test set
• PON power meter preferably with wave length filtering
• Fiberscope or videoscope
• Optical Time Domain Reflector (OTDR) meter, calibrated for 1310 nm and 1490 nm output
• Composite fiber cable for non‐connectorized installation
• ONT mounting hardware
• Silicone sealant (and application material, i.e., cotton swabs)
• Bonding clamp for grounding and securing the composite cable on non‐connectorized 
• 1 each, 60" Hi‐cap riser pipe (for composite cable installation)
• Tie wraps
• TexWipe
• TexWipe
64187712G2-5C
screws to mount the SWRD
installations
 
TM
Alco pad for fiber cleaning
 
TM
cloth for fiber cleaning