Failure and replacement of components during redundant operation
11.2 Failure and replacement of components of the distributed I/Os
Replacement procedure
Proceed as follows to replace PROFIBUS DP cables:
Step
1
2
186
What to do?
Check the cabling and localize the
interrupted PROFIBUS DP cable.
Replace the defective cable.
How does the system react?
The CPUs process the error OBs synchronized
with each other
With one-sided I/O:
Rack failure OB 86 (outgoing event)
The LED BUS1F goes out.
The DP slaves can be addressed via the
DP master system.
With switched I/O:
I/O redundancy error OB 70 (outgoing
event).
The DP slaves can be addressed via both
DP master systems.
The LED BUS1F and the LED REDF go
out.
CPU 410-5H Process Automation/CPU 410 SMART
System Manual, 09/2014, A5E32631667-AB