Preparing The Distribution Cabinet - Vertiv eSure 60017372 Installation Manual

Power extend converter, mounting bracket and door kit
Table of Contents

Advertisement

Preparing the Distribution Cabinet

Procedure
[ ] 1. If the power extend converter is to be installed for a newly connected load, connect the load and
load return cables for the distribution position to be occupied by the power extend converter. At the
same time, connect the power extend converter return wire faston tab (P/N 565990) provided with
the power extend converter to the cabinet's return busbar (use the same location as the return lead
to the load). At the same time (if required), connect the separately ordered power extend converter
paralleling busbar (P/N 60016097 for paralleling two converters, P/N 545346 for paralleling three
converters) to the distribution panel load busbars (use the same location as the load lead to the
load). See Figure 9. Torque as indicated in Figure 9.
[ ] 2. If the power extend converter is to replace an existing circuit breaker, remove the circuit breaker
and verify the load and return cables for the position are wired and labeled correctly. At the same
time, connect the power extend converter return wire faston tab (P/N 565990) provided with the
power extend converter to the cabinet's return busbar (use the same location as the return lead to
the load). At the same time (if required), connect the separately ordered power extend converter
paralleling busbar (P/N 60016097 for paralleling two converters, P/N 545346 for paralleling three
converters) to the distribution panel load busbars (use the same location as the load lead to the
load). See Figure 9. Torque as shown Figure 9.
Figure 9:
Connecting Power Extend Converter Load Return Cables to the Return Bar with the Power Extend
Converter Return Wire Faston Tab (P/N 565990) and Connecting Power Extend Converter Load
Cables to the Distribution Panel with Power Extend Converter Paralleling Busbar (P/N 60016097 or
545346) (if required) (cont'd on next page)
Installed View
Distribution Panel
Return Bar
Distribution Panel
Load Busbars
Vertiv
| eSure™ Power Extend Converter Mounting Bracket and Door Kit Installation Manual (IM60017372) | Rev. C
Connect
Power Extend Converter
Load Return Lead Here
(Torque to 72 in-lbs)
Front View
Connect
Power Extend Converter
Load Lead Here
(Torque to 72 in-lbs)
17

Advertisement

Table of Contents
loading