Mounting Power Distribution Units; Installing A Full-Height Pdu/Cable-Management Bracket - Vertiv DCF 48U Installer/User Manual

Optimized rack system
Table of Contents

Advertisement

4.5 Mounting Power Distribution Units

Power distribution units may be mounted on the rails or attached to mounting brackets in the DCF. The
following are the PDU options:
42U full-height PDU/cable-management mounting brackets (4-in. W) (Part # 546076G1L)
48U full=height PDU/cable-management mounting brackets (4-in. W) (Part # 546077G1L)

4.5.1 Installing a Full-height PDU/Cable-Management Bracket

The top and bottom of the 4-in. wide brackets are identical for use on either side of the cabinet.
To install a full-height bracket:
1.
Position the full-height bracket for installation with the inside bottom flange of the PDU resting
on the flange of the frame member at the top and bottom. See the flange in the following figure.
2. Hold the PDU bracket in place, then insert and tighten the screws.
Figure 4.6 Full-height bracket end
ITEM
DESCRIPTION
1
Bracket flange
2
Bracket clips
To reposition a full-height bracket:
1.
Loosen the screws in the top and bottom PDU hanging bracket.
2. Slide the bracket along the frame member to the desired location and tighten the screws.
To remove a full-height bracket:
1.
Loosen the screws in the top and bottom PDU hanging bracket.
2. Lift the bracket up until the hanging bracket clears the frame member and remove the
bracket from the cabinet.
Vertiv | DCF Installer/User Guide |
19

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dcf 42u

Table of Contents